国产免费a级片_国产jjizz一区二区三区视频_成人毛片视频免费看_熟女人妻在线视频_国产视频三区四区_亚洲欧美在线观看视频_久久久久久久久免费看无码_黄色aaa大片_欧美日韩国产黄色_日韩网红少妇无码视频香港

News

News

Precautions for operating canning equipment

2025-08-23

The operation of canning equipment (such as punching machines, edge rolling machines, welding machines, painting lines, etc.) must strictly follow safety regulations and operating procedures, ensuring the personal safety of operators and avoiding equipment damage and product quality issues. The following provides a detailed explanation of operational precautions from six core dimensions: safety protection, equipment inspection, operating standards, exception handling, occupational health, and equipment maintenance:


1. Safety protection: eliminate the risk of personal injury

Safety protection is the primary prerequisite for operating canning equipment, which requires "pre job inspection, on-the-job compliance, and no violations throughout the entire process":

  • Wear compliant protective equipment

    • Full protective equipment must be worn as required, and wearing clothing that may cause danger is prohibited

    • Mandatory wearing: safety helmet (to prevent falling objects or equipment components from falling from high altitude), anti smashing safety shoes (to avoid metal waste/parts from injuring feet), protective gloves (anti slip+anti metal burrs and scratches, high temperature/chemical resistant gloves are required for welding/painting positions), goggles (to prevent metal debris splashing for punching/cutting positions).

    • Prohibited from wearing: loose clothing (such as oversized cuffs, aprons), necklaces/bracelets/rings (easily tangled by equipment transmission components), and those with long hair should tuck their hair into a safety helmet (to avoid getting caught up in gears/belts).

  • Confirm that the safety device is effective

    Before starting up, it is necessary to check the safety protection devices of the equipment to ensure that there is no damage or failure:

    • Punching/Pressure Equipment: Check the dual hand start button (both hands need to be pressed simultaneously to start, to prevent one hand misoperation), photoelectric protection device (the equipment will stop immediately when blocked), and emergency stop button (red, prominently located and sensitive to pressing).

    • Curling/welding equipment: Check the protective fence (to prevent limbs from entering rotating parts) and spark protection cover (to prevent sparks from splashing and scalding during welding).

    • It is strictly prohibited to dismantle or shield safety devices without authorization (such as using tape to stick photoelectric sensors). If a device malfunction is found, immediately stop the machine and report it for repair.

  • Comply with the 'restricted area' rules

    • When the equipment is running, it is forbidden to insert hands, arms, or tools into dangerous areas such as the mold cavity, transmission gap, curling wheel, conveyor belt clamp, etc. (even if the equipment is running at low speed, it may trigger the action instantly).

    • Non operators are prohibited from entering the equipment operation area. If multiple people are required to cooperate (such as cutting and feeding), clear division of labor and the use of "gestures/passwords" to confirm should be made to avoid misoperation.


2. Equipment inspection: Ensure normal status before startup

Can making equipment is mostly operated with high precision and high load. A comprehensive inspection before startup can avoid equipment damage or accidents caused by "faulty operation":

  • Basic status check

    • Appearance: Check whether the equipment casing and protective cover are intact, without deformation or cracks; Are the anchor bolts of the equipment tightened to prevent vibration and displacement during operation.

    • Power/Air/Hydraulic: Confirm that the power supply voltage is stable (in accordance with the rated voltage of the equipment, such as 380V industrial electricity), the wires are not damaged, and the grounding is reliable; The gas source pressure is normal (such as 0.6-0.8MPa), and there is no leakage in the trachea; The hydraulic system oil level is between the upper and lower limits, with no oil leakage or high oil temperature (generally ≤ 60 ℃).

  • Core component inspection

    Focus on inspecting key components based on equipment type:

    • Punching/stretching machine: It is necessary to check whether the mold is installed firmly and the gap is uniform (without misalignment); Whether the slider runs smoothly without any jamming or abnormal noise; Is the clutch sensitive to avoid slipping or sticking.

    • Edge rolling machine: Focus on checking the degree of wear of the edge rolling wheel (without serious scratches/deformation). If the wear is excessive, it can easily lead to uneven edge rolling of the can body; At the same time, confirm whether the pressure of the roller is appropriate (too loose may cause loose edges, while too tight may cause the roller to break or damage the can body).

    • Welding machine (such as seam welding): Check whether the electrode head is clean (without oxide accumulation, which can affect the conductivity of the welding and cause virtual connection of the solder joint); Check if the welding current and speed parameters match the material of the can body (for example, tinplate requires lower current, aluminum requires higher current, and if the parameters do not match, welding penetration or leakage may occur).

    • Coating/drying line: First, test spray to confirm if the nozzle is blocked (blockage can cause uneven coating thickness), and check if the nozzle atomization effect is uniform; Check if the temperature sensor of the drying oven is accurate (high temperature can easily cause coating coking, while low temperature can result in insufficient coating adhesion).

  • Material and tooling inspection

    • Confirm that the specifications of the materials to be processed (such as tinplate coils and aluminum sheets) meet the equipment requirements (with no deviation in thickness and width. If the material is too thick, it may get stuck in the equipment, and if it is too thin, it may be deformed by pressure). At the same time, check the surface of the materials for oil stains and scratches (oil stains can affect the coating or welding effect, and scratches can reduce the strength of the can body).

    • Check whether the fixtures and jigs (such as positioning blocks and suction cups) are intact, and confirm whether the positioning accuracy meets the standard (if the positioning is offset, it will cause dimensional deviation of the tank body and even cause equipment jamming).


3. Operation standard: Follow the process to avoid misoperation

  • Startup and trial operation

    • Before starting up, it is necessary to turn on the power in the order of "total power first, equipment power later", and wait for the equipment to complete self inspection (if the self inspection reports an error, the fault must be checked first, and forced startup is not allowed).

    • After the first start-up or replacement of materials/molds, it is necessary to conduct an "empty machine trial run" (running for 1-2 cycles without materials) to observe whether the equipment runs smoothly and synchronously (such as whether the punch slide and feeding mechanism are coordinated smoothly), and confirm that there are no abnormalities before starting the feeding production.

  • Production process operation

    • When feeding, it is necessary to maintain a "uniform and orderly" speed to avoid adding too much material at once (to prevent material accumulation and equipment jamming); If manual auxiliary feeding is required, special tools (such as push rods) should be used. It is forbidden to directly touch the contact area between the material and the equipment transmission components with hands.

    • Real time monitoring of product quality: The punching station needs to check whether there are cracks in the can body during stretching, the edge rolling station needs to randomly check the sealing of the edge rolling (which can be checked for leakage through "water injection test"), and the welding station needs to observe whether the welding points are continuous and free of leaks. If any quality problems are found, the machine should be stopped immediately for adjustment, and "production with problems" is not allowed.

    • It is prohibited to perform "illegal operations" while the equipment is running, such as cleaning the internal waste of the equipment by hand (after shutting down and cutting off the power), arbitrarily adjusting equipment parameters (such as welding current and punch pressure, parameter adjustments need to be confirmed by the team leader and recorded), leaning against the equipment shell (to avoid body imbalance caused by vibration and getting caught up in the equipment).

  • Shutdown process

    • The feeding should be stopped first, and after the remaining materials in the equipment are completely processed, the power should be cut off in the order of "equipment power first, then total power"; If it is a hydraulic or pneumatic equipment, the system pressure needs to be released first (such as closing the air source valve and hydraulic valve to avoid pressure residue causing unexpected equipment operation).

    • After shutting down, it is necessary to clean the surrounding materials of the equipment (sort and stack finished products and waste materials, and place waste materials in a dedicated metal waste bin to avoid falling on the ground and causing slipping), wipe the surface of the equipment with oil stains (use a dedicated cleaning agent, do not rinse live parts directly with water).


4. Exception handling: timely shutdown, scientific investigation

  • Immediate shutdown situation

    When the following situations occur, press the "emergency stop button" immediately to cut off the power:

    • The equipment experiences severe vibration and abnormal noise (such as gear collision sound, metal friction sound, which may be due to loose or damaged components);

    • Material jamming (such as the tank body getting stuck in the mold or conveyor belt, forced operation can cause equipment overload and damage);

    • Smoke and odor (such as burnt wires or overheated hydraulic oil, which may be due to electrical faults or hydraulic system abnormalities);

    • Personal safety hazards occur (such as failure of protective devices, splashing of materials).

  • Troubleshooting and repair reporting

    • After shutdown, it is not allowed to disassemble the equipment (especially professional components such as electrical cabinets and hydraulic systems) without authorization. The fault phenomenon should be recorded first (such as "abnormal noise during operation of the curling machine, accompanied by heating of the curling wheel"), and the equipment maintenance personnel should be notified in a timely manner.

    • During the maintenance process, it is necessary to hang a warning sign next to the equipment that reads' under maintenance, no turning on 'to prevent others from accidentally closing the switch; After the maintenance is completed, it is necessary to conduct an empty machine test run together with the maintenance personnel to confirm that the fault has been eliminated before resuming production.


5. Occupational Health: Focus on Long term Protection

  • Dust and exhaust gas protection

    • Stamping and cutting positions can generate metal dust, so it is necessary to ensure that the workshop ventilation system is normal (such as turning on exhaust fans or dust removal equipment), and if necessary, wear dust masks (N95 or above level) to avoid long-term inhalation of dust and respiratory diseases.

    • The painting and welding positions will generate volatile organic compounds (VOCs) or welding fumes. Local exhaust devices (such as welding fume purifiers and painting fumes collection hoods) need to be installed next to the workstation, and operators need to wear gas masks (filter boxes for organic vapors).

  • Noise and vibration protection

    • Punching machines and edge curling machines produce loud noise (usually exceeding 85dB) during operation, so it is necessary to wear noise proof earplugs or earmuffs to avoid hearing damage caused by long-term exposure; At the same time, regularly check the shock absorption devices of the equipment (such as the foot cushion) to reduce the impact of equipment vibration on the human body.

  • Daily routine and protective habits

    • Avoid prolonged continuous operation (it is recommended to take a 10 minute break every 1-2 hours and move your limbs) to prevent fatigue from causing lack of concentration and leading to misoperation.

    • Clean hands promptly after operation (especially after contact with paint or hydraulic oil, use industrial hand sanitizer to avoid chemical residue). If skin comes into contact with irritating liquids, rinse immediately with clean water for at least 15 minutes and seek medical examination.


6. Equipment maintenance: Extend lifespan, reduce malfunctions

  • Routine maintenance

    • After daily production, it is necessary to clean up the internal waste of the equipment (such as metal debris in the punch mold to avoid debris getting stuck in the mold), wipe the surface of the guide rail and transmission components, and add lubricating oil as required (such as guide rail oil and gear oil, do not mix oil products).

    • Check the wear condition of vulnerable parts (such as punch die cutting edge, edge sealing ring, welding machine electrode head). If the wear exceeds the standard, it needs to be replaced in a timely manner (if the die cutting edge becomes dull, it will cause burrs on the can body, and the cutting edge needs to be replaced or re ground).

  • Regular maintenance

    • Check the electrical wiring terminals of the equipment weekly for looseness (looseness can cause poor contact and equipment tripping), and tighten the loose terminals; Check the air source filter and hydraulic oil filter. If there are too many impurities, replace the filter element (impurities can block the pipeline and affect the system pressure).

    • Conduct a monthly "deep inspection" of key components of the equipment, such as the wear of the press clutch brake pads, the lubrication status of the rolling machine bearings, and whether the heating tubes of the drying furnace are aging (aging of the heating tubes can lead to uneven temperature), and keep maintenance records (indicating the maintenance date, component status, and replacement situation).

  • Long term maintenance

    • Conduct a comprehensive maintenance every quarter or six months (depending on the frequency of equipment use), such as replacing hydraulic oil, cleaning hydraulic oil tanks, checking the accuracy of equipment spindles and screws (if the accuracy decreases, calibration or repair is required); Dust the contactors and relays inside the electrical cabinet to avoid electrical faults caused by dust accumulation.


Related Information

HomeHome

Home

AboutAbout

About

ProductsProducts

Products

ResearchResearch

Research

ContactContact

Contact

Copyright: Shantou Xinqing Cannery Machinery Co., Ltd. Support: 11400.cc
 粵公網安備:44051102000566號 粵ICP備19094376號-1

成年人小视频在线观看| 亚洲 欧美 激情 小说 另类| 一区二区视频免费看| 91视频免费看片| 久操视频免费在线观看| 香蕉视频黄色在线观看| 91精品国产高清一区二区三密臀| 国产三区在线播放| 五月天婷婷在线观看| 成人免费毛片糖心| 日韩va在线观看| 91导航在线观看| 欧美一区二区三区成人精品| 午夜国产在线观看| 丰满熟女一区二区三区| 天天干天天插天天射| 国产 日韩 欧美 在线| 人妻大战黑人白浆狂泄| 91插插插插插插插插| 久久久久xxxx| 夜夜嗨av禁果av粉嫩avhd| 九九精品久久久| 亚洲理论片在线观看| 蜜桃无码一区二区三区| 91丨porny丨九色| 日本天堂网在线观看| 99视频在线观看免费| 激情四射综合网| 中文字幕亚洲精品一区| 久久人人爽人人人人片| 91精品国产乱码久久久久| 日本不卡一区在线| 国产三级国产精品国产国在线观看| 天天舔天天干天天操| 黄色成人一级片| 中文字幕一区二区三区四区在线视频 | 中日韩黄色大片| 欧美bbbbb性bbbbb视频| 国产视频一区二区三| 一本色道久久综合亚洲| 亚州国产精品视频| 人妻无码中文字幕免费视频蜜桃| 国产日韩欧美在线观看视频| 91国产精品一区| 中文在线字幕av| 三级网站免费观看| 久久久久久久麻豆| 国产精品视频一二区| 亚洲一区二区三区三州| 亚洲第一区av| 色诱av手机版| 日本黄色免费视频| 九九热最新视频| 国产视频一区二区三| 成人一级免费视频| 99精品视频免费看| 亚洲精品视频导航| 在线观看亚洲天堂| 一级做a爱片性色毛片| 欧美做爰爽爽爽爽爽爽| 久久久久久久久久久影视| 国产视频123区| 国产精品一区二区入口九绯色 | 免费黄频在线观看| 国产精品欧美综合| 成人区人妻精品一区二| 成年人在线免费看片| 99久久人妻无码精品系列| 亚洲精品网站在线| 一本色道久久综合精品婷婷| 亚洲视频 欧美视频| 亚洲日本精品视频| 91av在线免费视频| aaaa一级片| 成人免费黄色av| 国产大片免费看| 国产高清免费av| 国产精品国产一区二区三区四区 | 九九久久久久久| 精品人妻av一区二区三区| 狠狠操狠狠干视频| 精品人妻无码一区| 蜜臀av午夜精品久久| 内射一区二区三区| 日本黄色片视频| 天天综合网日韩| 亚洲 另类 春色 国产| 亚洲成人黄色片| 亚洲欧美日韩一二三区| www.超碰在线.com| 国产精品久久不卡| 精品在线免费观看视频| 欧美午夜精品理论片| 日韩欧美视频免费观看| 人妻少妇精品无码专区 | 国产大片aaa| 黄色av网站免费观看| 久久人人爽人人爽人人| 日韩一级在线视频| 在线免费观看成年人视频| 亚洲在线视频播放| www.久久久精品| 国产乱人乱偷精品视频a人人澡| 国产在线视频卡一卡二| 欧美一区二区免费在线观看| 亚洲av无码一区二区三区人 | 亚洲精品色午夜无码专区日韩| 99久久99久久精品免费| 国产视频1区2区3区| 可以直接看的无码av| 天天干天天干天天干天天| 亚洲色大成网站www| 国产精品suv一区二区88| 久久丫精品忘忧草西安产品| 天天干天天色综合| 91制片厂毛片| 精品人妻伦九区久久aaa片| 日本一区二区三区在线免费观看| 亚洲va久久久噜噜噜无码久久| 97免费观看视频| 久久精品一区二区免费播放| 婷婷激情五月综合| 91美女免费看| 麻豆成人免费视频| 中文字幕一区久久| 中文字幕人成人乱码亚洲电影| 久久久久久久国产视频| 日韩成人免费在线视频| 天堂在线中文网| 99久久人妻精品免费二区| 国产一级片中文字幕| 神马久久精品综合| av噜噜在线观看| 欧美色图亚洲视频| 亚洲一区二区三区观看| 久草手机在线视频| 中文字幕国产传媒| 精品深夜av无码一区二区老年 | 国产制服丝袜在线| 午夜一区二区三区免费| 国产wwwxxx| 日本在线免费观看| 999精品在线视频| 欧美熟妇交换久久久久久分类 | 久久艹精品视频| 中文av字幕在线观看| 国产探花精品一区二区| 亚洲成a人片在线www| 国产伦精品一区二区三区妓女| 五月婷婷激情视频| 国产污片在线观看| 宅男噜噜噜66国产免费观看| 国产在线免费视频| 亚洲精品一区二区三区影院忠贞| 激情文学亚洲色图| 亚洲图片视频小说| 日韩福利在线视频| 国产黄色av片| 在线观看亚洲天堂| 久久精品色妇熟妇丰满人妻| 97超碰资源站| 午夜精品免费观看| 久久久精品国产sm调教| 91传媒理伦片在线观看| 天堂а√在线中文在线鲁大师| 国产乱码久久久| 中文字幕在线播放不卡| 欧美日韩在线视频免费播放| free性中国hd国语露脸| 午夜一级免费视频| 久久青青草原亚洲av无码麻豆| a天堂视频在线| 午夜爱爱毛片xxxx视频免费看| 精品无码免费视频| 波多野结衣亚洲色图| 亚洲av熟女国产一区二区性色| 精品人妻一区二区免费视频| 国产一级理论片| 亚欧美一区二区三区| 九九九九九伊人| av免费观看在线| 天堂www中文在线资源| 极品人妻一区二区三区| 99精品在线播放| 中文字幕天天干| 色婷婷综合视频| 美国黄色特级片| 国产在线视频第一页| 91人妻一区二区| 中文字幕a级片| 三级网站在线看| 农村末发育av片一区二区| 国产精品伊人久久| 91香蕉视频导航| 中文字幕资源网| 在线观看黄色网| 天堂成人在线视频| 欧美日韩精品亚洲精品| 精品人妻一区二区三区浪潮在线| 国产大片aaa| xxxx 国产| 99热这里只有精| 亚洲最大成人在线观看| 伊人网伊人影院| 亚洲av无码成人精品区| 深爱五月激情五月| 日韩美女视频网站| 日本高清视频免费观看| 免费在线视频一区二区| 久久久久亚洲av无码a片| 精产国品一区二区三区| 好吊色一区二区三区| 国产又粗又大又爽| 韩国av免费观看| 狠狠人妻久久久久久综合| 丰满人妻av一区二区三区| 成人乱码一区二区三区| 成人免费区一区二区三区| 成人日韩在线视频| 高清一区二区视频| 国产精品视频看看| 国产伦子伦对白视频| 国产亚洲视频一区| 精品人妻一区二区三区四区| 精品国产视频在线观看| 免费看黄网站在线观看| 麻豆精品久久久久久久99蜜桃| 蜜桃传媒一区二区亚洲| 欧美专区第二页| 天堂av网手机版| 亚洲不卡视频在线| 亚洲精品成人电影| 97在线公开视频| 国产精品麻豆一区| 精品人妻一区二区三区潮喷在线| 久久久www成人免费毛片| 六月婷婷七月丁香| 日本一卡二卡在线| 午夜av入18在线| 亚洲人与黑人屁股眼交| h色网站在线观看| 国产无套内射又大又猛又粗又爽| 国产一级二级av| 久久综合在线观看| 天天操天天爽天天干| 一区二区在线免费观看视频 | 伊人成人在线观看| 亚洲精品中文字幕乱码无线| mm131亚洲精品| 国产又大又黄又粗又爽| 美女的奶胸大爽爽大片| 少妇一级淫免费观看| 中文字幕一区二区人妻视频| xxxwww国产| 久久久香蕉视频| 三级网站在线免费观看| 亚洲欧美黄色片| 国产精品久久久久久久久毛片 | 亚洲一区二区自偷自拍| 丰满的亚洲女人毛茸茸| 久久视频一区二区三区| 午夜精品一区二区三| 亚洲一区二区人妻| 狠狠人妻久久久久久综合蜜桃| 欧洲一级黄色片| 最近中文在线观看| 国产乱女淫av麻豆国产| 日韩精品成人在线| 亚洲字幕av一区二区三区四区| 国产成人a v| 可以免费在线观看的av| 伊人久久久久久久久久久久| av在线资源观看| 免费的黄色av| 中文字幕资源网| 精品人伦一区二区| 一区二区黄色片| 国产精品久久久久久久av福利 | 国产成人亚洲精品自产在线 | 一级久久久久久| 久久狠狠高潮亚洲精品| 亚洲 精品 综合 精品 自拍| 国产精品久久久久久久久夜色| 日本一卡二卡在线| www色com| 色综合99久久久无码国产精品| 99国产成人精品| 欧美亚洲日本在线| 91麻豆精品久久毛片一级| 欧美激情精品久久| 亚洲天堂视频网站| 殴美一级黄色片| av免费一区二区| 少妇高潮一区二区三区69| 成年人三级黄色片| 五月天婷婷激情| 黄色一级大片在线免费观看| 中文字幕欧美人妻精品一区蜜臀| 韩国中文字幕hd久久精品| 中文字幕久久久久久久| 久久精品波多野结衣| 亚洲毛片亚洲毛片亚洲毛片| 欧美黑人精品一区二区不卡| 99久久人妻无码精品系列| 日韩一区二区三区在线观看视频| 国产成人无码www免费视频播放| 天天天天天天天干| 黄色av一级片| 99国产精品99| 一区二区三区免费在线观看视频 | 中文字幕一区二区三区四| 久久精品一区二区免费播放| 一出一进一爽一粗一大视频| 青草视频在线观看免费| 不卡一区二区在线观看| 午夜福利视频一区二区| 国产在成人精品线拍偷自揄拍| 中文亚洲av片在线观看| 久久视频精品在线观看| 一级黄色片网站| 午夜视频在线观看国产| 久久免费视频精品| mm131亚洲精品| 最新黄色av网址| 人人妻人人澡人人爽久久av| 国产精品2020| 91精品在线视频观看| 天堂中文在线网| 国产主播在线播放| 99久久国产精| 亚洲精品国产一区黑色丝袜| 日韩福利在线视频| 精品无码一区二区三区的天堂| 91精品一区二区三区蜜桃| 一区二区三区免费播放| 日本精品一区二区在线观看| 国内精品久久久久久久久久久 | 色婷婷狠狠18禁久久| 精品人妻一区二区三| a视频免费在线观看| 中文字幕一区二区久久人妻| 日本熟妇人妻中出| 精品人妻一区二区三区蜜桃视频 | 中文字幕视频一区二区| 日本在线观看免费视频| 免费国产羞羞网站美图| 国内av免费观看| 国产精品成人久久久| 97人人爽人人| 亚洲黄色在线观看视频| 在线免费a视频| 性色av无码久久一区二区三区| 欧美在线视频第一页| 久久国产露脸精品国产| 精品久久久99| 九九热精品免费视频| 国产精品视频一二区| 国产a∨精品一区二区三区仙踪林| 亚洲综合视频网站| 亚洲乱色熟女一区二区三区| 一区二区 亚洲| 中国美女乱淫免费看视频| 五月天av在线播放| 手机在线成人av| 无码人妻精品中文字幕| 日韩一级理论片| 天天综合天天做| 在线播放成人av| 午夜免费福利在线| 在线观看亚洲黄色| 亚洲精品一区二区三区在线播放 | 91性高潮久久久久久久| 亚洲综合图片网| 97人妻一区二区精品视频| www.日本在线观看| 国产sm调教视频| 国产精品21p| 国产色视频一区二区三区qq号| 国产毛片久久久久久久| 国产亚洲色婷婷久久99精品91 | 亚洲精品国产av| 亚洲日本精品视频| 99久在线精品99re8热| 动漫精品一区一码二码三码四码| 国产wwwxxx| 久久精品国产亚洲AV熟女| 免费a在线观看播放| 少妇精品无码一区二区| 一区二区成人网| 91人人澡人人爽| 国产91免费看| 精品人妻一区二区三区潮喷在线| 免费观看国产视频| 欧美亚洲日本在线| 无码精品人妻一区二区| 亚洲人成色777777精品音频| 国产xxxx在线观看| 精品人妻一区二区三区蜜桃| 日韩va亚洲va欧美va清高| 在线观看日本www|