国产免费a级片_国产jjizz一区二区三区视频_成人毛片视频免费看_熟女人妻在线视频_国产视频三区四区_亚洲欧美在线观看视频_久久久久久久久免费看无码_黄色aaa大片_欧美日韩国产黄色_日韩网红少妇无码视频香港

News

News

Precautions for operating canning equipment

2025-08-23

The operation of canning equipment (such as punching machines, edge rolling machines, welding machines, painting lines, etc.) must strictly follow safety regulations and operating procedures, ensuring the personal safety of operators and avoiding equipment damage and product quality issues. The following provides a detailed explanation of operational precautions from six core dimensions: safety protection, equipment inspection, operating standards, exception handling, occupational health, and equipment maintenance:


1. Safety protection: eliminate the risk of personal injury

Safety protection is the primary prerequisite for operating canning equipment, which requires "pre job inspection, on-the-job compliance, and no violations throughout the entire process":

  • Wear compliant protective equipment

    • Full protective equipment must be worn as required, and wearing clothing that may cause danger is prohibited

    • Mandatory wearing: safety helmet (to prevent falling objects or equipment components from falling from high altitude), anti smashing safety shoes (to avoid metal waste/parts from injuring feet), protective gloves (anti slip+anti metal burrs and scratches, high temperature/chemical resistant gloves are required for welding/painting positions), goggles (to prevent metal debris splashing for punching/cutting positions).

    • Prohibited from wearing: loose clothing (such as oversized cuffs, aprons), necklaces/bracelets/rings (easily tangled by equipment transmission components), and those with long hair should tuck their hair into a safety helmet (to avoid getting caught up in gears/belts).

  • Confirm that the safety device is effective

    Before starting up, it is necessary to check the safety protection devices of the equipment to ensure that there is no damage or failure:

    • Punching/Pressure Equipment: Check the dual hand start button (both hands need to be pressed simultaneously to start, to prevent one hand misoperation), photoelectric protection device (the equipment will stop immediately when blocked), and emergency stop button (red, prominently located and sensitive to pressing).

    • Curling/welding equipment: Check the protective fence (to prevent limbs from entering rotating parts) and spark protection cover (to prevent sparks from splashing and scalding during welding).

    • It is strictly prohibited to dismantle or shield safety devices without authorization (such as using tape to stick photoelectric sensors). If a device malfunction is found, immediately stop the machine and report it for repair.

  • Comply with the 'restricted area' rules

    • When the equipment is running, it is forbidden to insert hands, arms, or tools into dangerous areas such as the mold cavity, transmission gap, curling wheel, conveyor belt clamp, etc. (even if the equipment is running at low speed, it may trigger the action instantly).

    • Non operators are prohibited from entering the equipment operation area. If multiple people are required to cooperate (such as cutting and feeding), clear division of labor and the use of "gestures/passwords" to confirm should be made to avoid misoperation.


2. Equipment inspection: Ensure normal status before startup

Can making equipment is mostly operated with high precision and high load. A comprehensive inspection before startup can avoid equipment damage or accidents caused by "faulty operation":

  • Basic status check

    • Appearance: Check whether the equipment casing and protective cover are intact, without deformation or cracks; Are the anchor bolts of the equipment tightened to prevent vibration and displacement during operation.

    • Power/Air/Hydraulic: Confirm that the power supply voltage is stable (in accordance with the rated voltage of the equipment, such as 380V industrial electricity), the wires are not damaged, and the grounding is reliable; The gas source pressure is normal (such as 0.6-0.8MPa), and there is no leakage in the trachea; The hydraulic system oil level is between the upper and lower limits, with no oil leakage or high oil temperature (generally ≤ 60 ℃).

  • Core component inspection

    Focus on inspecting key components based on equipment type:

    • Punching/stretching machine: It is necessary to check whether the mold is installed firmly and the gap is uniform (without misalignment); Whether the slider runs smoothly without any jamming or abnormal noise; Is the clutch sensitive to avoid slipping or sticking.

    • Edge rolling machine: Focus on checking the degree of wear of the edge rolling wheel (without serious scratches/deformation). If the wear is excessive, it can easily lead to uneven edge rolling of the can body; At the same time, confirm whether the pressure of the roller is appropriate (too loose may cause loose edges, while too tight may cause the roller to break or damage the can body).

    • Welding machine (such as seam welding): Check whether the electrode head is clean (without oxide accumulation, which can affect the conductivity of the welding and cause virtual connection of the solder joint); Check if the welding current and speed parameters match the material of the can body (for example, tinplate requires lower current, aluminum requires higher current, and if the parameters do not match, welding penetration or leakage may occur).

    • Coating/drying line: First, test spray to confirm if the nozzle is blocked (blockage can cause uneven coating thickness), and check if the nozzle atomization effect is uniform; Check if the temperature sensor of the drying oven is accurate (high temperature can easily cause coating coking, while low temperature can result in insufficient coating adhesion).

  • Material and tooling inspection

    • Confirm that the specifications of the materials to be processed (such as tinplate coils and aluminum sheets) meet the equipment requirements (with no deviation in thickness and width. If the material is too thick, it may get stuck in the equipment, and if it is too thin, it may be deformed by pressure). At the same time, check the surface of the materials for oil stains and scratches (oil stains can affect the coating or welding effect, and scratches can reduce the strength of the can body).

    • Check whether the fixtures and jigs (such as positioning blocks and suction cups) are intact, and confirm whether the positioning accuracy meets the standard (if the positioning is offset, it will cause dimensional deviation of the tank body and even cause equipment jamming).


3. Operation standard: Follow the process to avoid misoperation

  • Startup and trial operation

    • Before starting up, it is necessary to turn on the power in the order of "total power first, equipment power later", and wait for the equipment to complete self inspection (if the self inspection reports an error, the fault must be checked first, and forced startup is not allowed).

    • After the first start-up or replacement of materials/molds, it is necessary to conduct an "empty machine trial run" (running for 1-2 cycles without materials) to observe whether the equipment runs smoothly and synchronously (such as whether the punch slide and feeding mechanism are coordinated smoothly), and confirm that there are no abnormalities before starting the feeding production.

  • Production process operation

    • When feeding, it is necessary to maintain a "uniform and orderly" speed to avoid adding too much material at once (to prevent material accumulation and equipment jamming); If manual auxiliary feeding is required, special tools (such as push rods) should be used. It is forbidden to directly touch the contact area between the material and the equipment transmission components with hands.

    • Real time monitoring of product quality: The punching station needs to check whether there are cracks in the can body during stretching, the edge rolling station needs to randomly check the sealing of the edge rolling (which can be checked for leakage through "water injection test"), and the welding station needs to observe whether the welding points are continuous and free of leaks. If any quality problems are found, the machine should be stopped immediately for adjustment, and "production with problems" is not allowed.

    • It is prohibited to perform "illegal operations" while the equipment is running, such as cleaning the internal waste of the equipment by hand (after shutting down and cutting off the power), arbitrarily adjusting equipment parameters (such as welding current and punch pressure, parameter adjustments need to be confirmed by the team leader and recorded), leaning against the equipment shell (to avoid body imbalance caused by vibration and getting caught up in the equipment).

  • Shutdown process

    • The feeding should be stopped first, and after the remaining materials in the equipment are completely processed, the power should be cut off in the order of "equipment power first, then total power"; If it is a hydraulic or pneumatic equipment, the system pressure needs to be released first (such as closing the air source valve and hydraulic valve to avoid pressure residue causing unexpected equipment operation).

    • After shutting down, it is necessary to clean the surrounding materials of the equipment (sort and stack finished products and waste materials, and place waste materials in a dedicated metal waste bin to avoid falling on the ground and causing slipping), wipe the surface of the equipment with oil stains (use a dedicated cleaning agent, do not rinse live parts directly with water).


4. Exception handling: timely shutdown, scientific investigation

  • Immediate shutdown situation

    When the following situations occur, press the "emergency stop button" immediately to cut off the power:

    • The equipment experiences severe vibration and abnormal noise (such as gear collision sound, metal friction sound, which may be due to loose or damaged components);

    • Material jamming (such as the tank body getting stuck in the mold or conveyor belt, forced operation can cause equipment overload and damage);

    • Smoke and odor (such as burnt wires or overheated hydraulic oil, which may be due to electrical faults or hydraulic system abnormalities);

    • Personal safety hazards occur (such as failure of protective devices, splashing of materials).

  • Troubleshooting and repair reporting

    • After shutdown, it is not allowed to disassemble the equipment (especially professional components such as electrical cabinets and hydraulic systems) without authorization. The fault phenomenon should be recorded first (such as "abnormal noise during operation of the curling machine, accompanied by heating of the curling wheel"), and the equipment maintenance personnel should be notified in a timely manner.

    • During the maintenance process, it is necessary to hang a warning sign next to the equipment that reads' under maintenance, no turning on 'to prevent others from accidentally closing the switch; After the maintenance is completed, it is necessary to conduct an empty machine test run together with the maintenance personnel to confirm that the fault has been eliminated before resuming production.


5. Occupational Health: Focus on Long term Protection

  • Dust and exhaust gas protection

    • Stamping and cutting positions can generate metal dust, so it is necessary to ensure that the workshop ventilation system is normal (such as turning on exhaust fans or dust removal equipment), and if necessary, wear dust masks (N95 or above level) to avoid long-term inhalation of dust and respiratory diseases.

    • The painting and welding positions will generate volatile organic compounds (VOCs) or welding fumes. Local exhaust devices (such as welding fume purifiers and painting fumes collection hoods) need to be installed next to the workstation, and operators need to wear gas masks (filter boxes for organic vapors).

  • Noise and vibration protection

    • Punching machines and edge curling machines produce loud noise (usually exceeding 85dB) during operation, so it is necessary to wear noise proof earplugs or earmuffs to avoid hearing damage caused by long-term exposure; At the same time, regularly check the shock absorption devices of the equipment (such as the foot cushion) to reduce the impact of equipment vibration on the human body.

  • Daily routine and protective habits

    • Avoid prolonged continuous operation (it is recommended to take a 10 minute break every 1-2 hours and move your limbs) to prevent fatigue from causing lack of concentration and leading to misoperation.

    • Clean hands promptly after operation (especially after contact with paint or hydraulic oil, use industrial hand sanitizer to avoid chemical residue). If skin comes into contact with irritating liquids, rinse immediately with clean water for at least 15 minutes and seek medical examination.


6. Equipment maintenance: Extend lifespan, reduce malfunctions

  • Routine maintenance

    • After daily production, it is necessary to clean up the internal waste of the equipment (such as metal debris in the punch mold to avoid debris getting stuck in the mold), wipe the surface of the guide rail and transmission components, and add lubricating oil as required (such as guide rail oil and gear oil, do not mix oil products).

    • Check the wear condition of vulnerable parts (such as punch die cutting edge, edge sealing ring, welding machine electrode head). If the wear exceeds the standard, it needs to be replaced in a timely manner (if the die cutting edge becomes dull, it will cause burrs on the can body, and the cutting edge needs to be replaced or re ground).

  • Regular maintenance

    • Check the electrical wiring terminals of the equipment weekly for looseness (looseness can cause poor contact and equipment tripping), and tighten the loose terminals; Check the air source filter and hydraulic oil filter. If there are too many impurities, replace the filter element (impurities can block the pipeline and affect the system pressure).

    • Conduct a monthly "deep inspection" of key components of the equipment, such as the wear of the press clutch brake pads, the lubrication status of the rolling machine bearings, and whether the heating tubes of the drying furnace are aging (aging of the heating tubes can lead to uneven temperature), and keep maintenance records (indicating the maintenance date, component status, and replacement situation).

  • Long term maintenance

    • Conduct a comprehensive maintenance every quarter or six months (depending on the frequency of equipment use), such as replacing hydraulic oil, cleaning hydraulic oil tanks, checking the accuracy of equipment spindles and screws (if the accuracy decreases, calibration or repair is required); Dust the contactors and relays inside the electrical cabinet to avoid electrical faults caused by dust accumulation.


Related Information

HomeHome

Home

AboutAbout

About

ProductsProducts

Products

ResearchResearch

Research

ContactContact

Contact

Copyright: Shantou Xinqing Cannery Machinery Co., Ltd. Support: 11400.cc
 粵公網安備:44051102000566號 粵ICP備19094376號-1

国产视频三区四区| 91免费视频播放| 波多野结衣 久久| 老司机久久精品| 中文字幕在线播放日韩| 国产一国产二国产三| 天天爽夜夜爽夜夜爽| 国产精品自产拍| 天天综合久久综合| 国产一区二区播放| 一区二区三区人妻| 精品久久久久久久久久久久久久久久 | 午夜老司机福利| 国产免费久久久久| 午夜视频在线免费看| 国产喷水在线观看| 在线观看免费不卡av| 激情五月俺来也| 亚洲精品无码专区| 欧美日韩中文字幕视频| mm131亚洲精品| 天天看片中文字幕| 黄色片一区二区三区| 亚洲精品www久久久久久| 六月婷婷中文字幕| 成年人一级黄色片| 在线观看国产成人| 欧美视频在线观看一区二区三区| 97在线观看视频免费| 日韩熟女精品一区二区三区| 国产熟女一区二区三区五月婷| 中文字幕av片| 日本一区二区不卡在线| 国产精品51麻豆cm传媒| 永久免费看片在线播放| 久久午夜免费视频| 超碰97在线资源站| 中文字幕+乱码+中文乱码www| 毛茸茸free性熟hd| 国产精品女人久久久| 亚洲综合久久av一区二区三区| 人人干人人干人人干| 国产男男chinese网站| 亚洲在线观看网站| 一区二区不卡视频在线观看| 看黄色一级大片| 国产人妻精品一区二区三| 一二三四在线观看视频| 四季av一区二区| 久草手机在线观看| 国产传媒视频在线| 91av在线免费视频| 中文字幕一区二区人妻视频| 色婷婷在线视频| 欧美 中文字幕| 国产性生活视频| 动漫精品一区二区三区| 97久久人国产精品婷婷| 中文字幕第99页| 天天爽夜夜爽人人爽| 日韩av电影网址| 欧美黄色激情视频| 久久久午夜精品福利内容| 国产免费看av| 国产一级二级三级视频| 国产 欧美 日韩 在线| 亚洲三区在线播放| 亚洲美女在线播放| 中文字幕一区二区人妻电影丶 | 日韩精品人妻中文字幕有码| 麻豆精品一区二区三区视频| 国产中文av在线| 国产一级特黄a大片免费| 国产成人av免费在线观看| 一本色道久久亚洲综合精品蜜桃| 亚洲国产成人在线观看| 亚洲狼人综合干| 亚洲精品国产一区二| 亚洲乱码国产乱码精品| 一级特黄aaa| 一级片免费网址| 亚洲人妻一区二区三区| 一级特黄色大片| 91人人澡人人爽人人精品| 亚洲中文字幕无码av| 亚洲污视频在线观看| 91精品国产高潮对白| av在线网站免费观看| 国产 日韩 欧美 精品| 国产精品一区二区小说 | 亚洲av片在线观看| 中文字幕第88页| 一级特黄aaa大片| 国产wwwwwww| 国产一区二区三区四区五区六区| 黑丝av在线播放| 麻豆精品一区二区三区视频| 日韩三级av在线| 亚洲AV午夜精品| 亚洲熟女少妇一区二区| www.超碰在线.com| 国产又黄又大又粗的视频| 国产情侣久久久久aⅴ免费| 久草国产在线视频| 人妻与黑人一区二区三区| 亚洲GV成人无码久久精品| 亚洲精品久久久久久久久久久久久久 | 成人爽a毛片一区二区| 国产精品一区二区三区四| 久久久久久久久影院| 欧美特黄一级视频| 午夜久久久久久久久久影院| 亚洲综合免费视频| 国产又黄又粗又硬| 人妻aⅴ无码一区二区三区| 一区二区三区视频免费看| 99久久精品免费视频| 国产原创剧情av| 欧美日韩综合在线观看| 中文字幕福利视频| 国产成人精品一区二区色戒 | 亚洲手机在线观看| 国产伦子伦对白视频| 欧美黄色激情视频| 亚洲欧美一区二区三区在线观看| 国产黄色小视频在线观看| 免费黄色网址在线| 中文字幕乱码av| 国产精品久久久免费视频| 欧美一级淫片aaaaaa| 中文字幕精品在线观看| 国产区在线观看视频| 色噜噜狠狠一区二区三区狼国成人| 中文字幕一区二区三区四区在线视频| 二区三区四区视频| 日本人视频jizz页码69| 91美女免费看| 日本精品在线免费观看| 37p粉嫩大胆色噜噜噜| 久久久久久久久久综合| 亚洲精品国产欧美在线观看| 九九视频免费看| 亚洲精品乱码久久久久久蜜桃欧美 | 久久精品第一页| 午夜福利一区二区三区| 国产精品99精品| 天堂8在线视频| 国产大片一区二区三区| 天天干天天草天天射| 超碰中文字幕在线观看| 日日碰狠狠添天天爽| www.av网站| 天海翼在线视频| 国产永久免费网站| 中文字幕欧美视频| 久久黄色一级视频| 97超碰人人模人人人爽人人爱| 欧美日韩一区二区三区四区五区六区| 一本色道久久综合精品婷婷| 精品少妇人妻av一区二区三区| 中国免费黄色片| 久久久久99精品成人片毛片| 艳妇乳肉豪妇荡乳av无码福利| 青青青视频在线免费观看| 波多野结衣国产精品| 天天干天天操天天操| 国产又黄又猛又粗又爽的视频| 亚洲精品乱码久久久久久9色| 欧美xxxx精品| 成人无码精品1区2区3区免费看| 少妇极品熟妇人妻无码| 国产综合精品久久久久成人av| 中国毛片在线观看| 秋霞视频一区二区| 国产又大又粗又爽| aaa在线视频| 一区二区三区免费高清视频| 男人添女人荫蒂国产| 国产aⅴ爽av久久久久成人| 亚洲va综合va国产va中文| 久久久久久久极品内射| 国产黄色小视频网站| 亚洲精品久久久久久| 日韩在线视频不卡| 九九热久久免费视频| www.五月婷婷| 中文字幕18页| 色乱码一区二区三区在线| 精品人妻无码一区二区三区蜜桃一| 911亚洲精选| 天天色棕合合合合合合合| 日韩欧美中文字幕视频| 亚洲二区在线播放| 中文字幕一区久久| 人妻中文字幕一区二区三区| 精品国产999久久久免费| 超碰在线观看av| 亚洲午夜精品在线观看| 一区二区三区四区免费| 色乱码一区二区三区在线| 欧美成人久久久免费播放| 国产真人真事毛片| 国产成人精品a视频一区| www.youjizz.com亚洲| 2017亚洲天堂| 亚洲熟女毛茸茸| 亚洲国产日韩在线观看| 在线观看免费黄色小视频| 五月综合色婷婷| 日本乱子伦xxxx| 精品久久久久中文慕人妻| 国产精品嫩草69影院| 国产精品手机在线观看| 国产成人麻豆精品午夜在线| a天堂在线视频| 99在线视频免费| 99riav国产精品视频| 91视频免费网址| 91网址在线播放| 91人妻一区二区三区蜜臀| 亚洲天堂视频网站| 夜夜爽妓女8888视频免费观看| 一本色道久久hezyo无码| 亚洲一区二区激情| 91激情在线观看| av电影中文字幕| 懂色av蜜臀av粉嫩av喷吹 | 国产一区二区精彩视频| 国产精品成人网站| 国产精品久久欧美久久一区| 国产91免费看| 国产性生活大片| 精产国品一区二区| 精品国产999久久久免费| 久久久久久无码精品人妻一区二区| 久久噜噜色综合一区二区| 欧美视频在线观看一区二区三区| 日本免费网站在线观看| 天天插天天操天天射| 一区二区不卡视频在线观看| 国产二级一片内射视频播放| 狠狠人妻久久久久久综合蜜桃| 亚洲欧美丝袜中文综合| 97免费在线观看视频| 国产精品区在线| 国产婷婷在线观看| 久久精品视频1| 日本国产在线视频| 亚洲不卡在线视频| 91精品国自产在线偷拍蜜桃| 国产高清不卡视频| 久热精品在线观看| 销魂美女一区二区| 亚洲这里只有精品| 中文字幕第三页| 91人妻一区二区| 国内免费精品视频| 日本在线观看视频一区| 一级做a爰片毛片| www.久久综合| 久久久久久久片| 香蕉视频色在线观看| 国产大片免费看| 成人福利小视频| 久久噜噜色综合一区二区| 午夜免费精品视频| 91日韩精品视频| 久久久久国产免费| 香蕉免费毛片视频| av在线天堂网| 人妻无码一区二区三区久久99| 在线视频第一页| 国产毛片一区二区三区va在线| 秋霞欧美一区二区三区视频免费| 亚洲精品中文字幕在线播放| 国产三级国产精品国产专区50 | 青草草在线视频| 日本久久综合网| 韩国无码一区二区三区精品| 四虎精品永久在线| 99久久99久久久精品棕色圆| 妺妺窝人体色www在线观看 | 黄色av一级片| 午夜一区二区视频| 国产69精品久久久久久久久久| 欧美日韩在线视频播放| 亚洲欧美国产中文| 久久久久久久片| 一二三四国产精品| 久久久综合久久久| 亚洲一级黄色录像| 青青草原国产视频| 少妇搡bbbb搡bbb搡打电话| 99久久精品国产一区色| 人妻av一区二区三区| 朝桐光av在线| 五月婷婷欧美激情| 国产无套丰满白嫩对白| 五月天综合激情网| 国产一级特黄毛片| 中文字幕在线有码| 免费观看成人毛片| 亚洲综合一二三| 日本视频在线免费| 国产成人精品亚洲| 亚洲av午夜精品一区二区三区| 精品国产成人亚洲午夜福利| 亚洲精品免费在线观看视频| 人妻aⅴ无码一区二区三区| 国产黄色片网站| 亚洲国产精品午夜在线观看| 欧美激情视频二区| 午夜国产在线视频| 精品人妻伦一二三区久久| 91精产国品一二三| 天堂成人在线视频| 人人爽人人av| 日韩一级片免费看| 国产一区二区三区在线视频观看| 亚洲欧美日韩精品一区| 日本久久综合网| 精品午夜福利视频| www.av成人| 中文字幕精品无| 日韩男人的天堂| 精品人妻在线播放| 成 人 黄 色 片 在线播放| ,亚洲人成毛片在线播放| 丰满熟女人妻一区二区三| 亚洲国产综合av| 深夜福利视频网站| 久久免费激情视频| 国产成人免费观看视频| 亚洲精品久久久久久久蜜桃 | 亚洲理论中文字幕| 天天爽夜夜爽夜夜爽精品| 久久夜靖品2区| 国产一级生活片| www.99热| 91网站免费入口| 亚洲欧洲国产视频| 伊人国产在线视频| 日韩不卡av在线| 欧美成人aaaaⅴ片在线看| 精品国产九九九| 国产污污视频在线观看| 色呦呦中文字幕| 久久狠狠高潮亚洲精品| 国内精品国产成人国产三级| 国产精品6666| av官网在线观看| 伊人久久久久久久久久久久久久 | 国产黄色网址在线观看| 亚洲精品久久久蜜桃动漫| 这里只有久久精品| 国产乱女淫av麻豆国产| 亚洲最新av网站| 亚洲男人天堂久久| 中文字幕第3页| 亚洲av无码一区二区三区网址| 久久亚洲AV无码专区成人国产| 国内精品偷拍视频| 亚洲女人在线观看| 亚洲婷婷在线观看| 中文字幕免费观看视频| 中字幕一区二区三区乱码| 无码人妻aⅴ一区二区三区玉蒲团| 日韩 欧美 中文| 欧美三日本三级少妇99| 欧美成人精品欧美一| 久久久久99精品成人片三人毛片| 久久精品黄色片| 久久国产精品波多野结衣| 国产三级漂亮女教师| 国产在线免费看| 国产中文av在线| 久久久老熟女一区二区三区91| 久久草视频在线| 欧美偷拍第一页| 欧美日韩中文视频| 天堂网av手机版| 亚洲 另类 春色 国产| 性欧美8khd高清极品| 午夜免费一区二区| 亚洲精品国产一区二区三区| 蜜桃视频污在线观看| 免费av一级片| 欧洲美熟女乱又伦| 亚洲第一第二区| 中文字幕人成人乱码亚洲电影| 亚洲自拍一区在线观看| 91香蕉国产视频| 成人小视频在线播放| 国产精品久久久免费观看| 成人午夜淫片100集| 精品视频站长推荐| 免费黄频在线观看| 亚洲 欧美 成人| 亚洲天堂国产视频| 国产一区二区在线不卡|